Installation is complete in 6 easy steps: 1) uncrating modules; 2) completing panel box terminations; 3) racking the modules; 4) making piping connections; 5) executing system diagnostics check; and 6) start up!
The process flows smoothly from each step as our team of engineers begins uncrating our CapDI modules from the shipping container. Once all modules are out of the container, we begin preparing the panel box for all terminations. We then rack all modules into their permanent spots in the system frame, where they are connected to the piping. Once connected, we run a comprehensive system diagnostics check to ensure completeness for a timely start up, and customers begin benefiting from CapDI immediately!
This video shows the complete process of the start up of an IS36, but our systems range anywhere from an IS2 to larger than an IS300.